.grid-toolsets.share .toolset-tile:first-of-type{ background-color:#F6A81C; }

BOMLink

Toolset converting data in hsbDesign models into a Bill of Materials (BOM) stock lists to be sourced internally or from third parties. Full integration with ERP solutions is supported.
DOWNLOAD BROCHUREManufactureManufactureManufacture
hsbcad is trusted by leading companies in the offsite timber industry
hsb
BOMLink

hsbBOMlink (BOM) is a hybrid toolset that provides stock lists from both manufacturers and third-party suppliers, with the capability to integrate with an enterprise resource planning (ERP) system. It is used for material requirements planning (MRP) analysis, costing, and planned orders. It carries a unique selection ID (USID), stored in an inventory for materials selected in a project based on priority and usage assigned. Maintaining an inventory can provide a customisable selection of automatic factory-selected components offset vs site-assembled components. Creation of simple single-level Bill of Materials (BOM) of raw materials or extensive multi-level BOM of grouped sub-assembly materials are all within reach.

Main features
Technical features

More toolsets in

Manufacture

hsbMake was developed to give you the right tools to get an insight on how your factory is running and where the limitations are in your workflow. Discover the other dynamic toolsets that are associated with this innovative solution.

Download the hsbcad brochure